Aug 4, 2010
The cribber started! Yay! Whenever there are gaps in time between one activity and the next, it feels like forever. I can't believe how slow it is to mobilize certain people- and how start/stop motion it is.
Why do they call it cribbing? Wikipedia wasn't much help. Anyway, Ken the cribber started forming the footings. I changed the footing design somewhat, causing a delay in starting because the materials from the lumber company [Nelson Lumber] didn't arrive. I wanted the load-bearing inside wood stud wall of the basement to land on the footing and not the basement slab, as I had originally drawn it. Hopefully, this will limit the slab movement and cracking to the base of the interior wood stud wall.
No comments:
Post a Comment